A new GMP Grade C Manufacturing Facility- Circa 600m2

March 12, 2024

All structures have walls, but who is to says walls have only structural purposes. Walls can be one of the most expressive and creative elements of a structure. 

In this room, walls are transformed into visual masterpieces, encompassing functionality and form all at the same time. 

August 1, 2024
Modifications to existing GMP Grade A/B manufacturing facility.
March 12, 2024
A new GMP Grade C manufacturing facility was designed to maintain close control Humidity and temperature conditions. As part of Jacobs Bond Pascoe works was to design a Grade A UDAF in the dispensary area. A new BMS and EMS system was designed , installed and validated
January 18, 2024
Our client approached Jacobs Bond Pascoe after MHRA had served them with a notice to stop production due to particale count in at various positions in the Grade B Facility. Jacobs Bond Pascoe undertook a CFD to establish the problem area's and made modifications to the air distribution HVAC plant.